Systems design study of the Pioneer Venus spacecraft. Volume 1. Technical analyses and tradeoffs, sections 1-4 (part 1 of 4)The results are reported of the Pioneer Venus studies from 2 October 1972 through 30 June 1973. Many missions were considered, involving two launch vehicles (Thor/Delta and Atlas/Centaur), and different launch opportunities and spacecraft configurations to meet varying science requirements, all at minimum cost. The sequence of events is described and the specific studies conducted are summarized. The effects of science payload on mission and spacecraft design are discussed along with the mission analyses.
Document ID
19740024191
Acquisition Source
Legacy CDMS
Document Type
Contractor Report (CR)
Date Acquired
September 3, 2013
Publication Date
July 29, 1973
Subject Category
Space Vehicles
Report/Patent Number
NASA-CR-137504
TRW-2291-6005-RU-00
Accession Number
74N32304
Funding Number(s)
CONTRACT_GRANT: NAS2-7249
Distribution Limits
Public
Copyright
Work of the US Gov. Public Use Permitted.