NASA Logo

NTRS

NTRS - NASA Technical Reports Server

Back to Results
Development and verification of NASA Standard Initiator-2 (NSI-2): AppendixThis is the Appendix to the Final Report on the results of verification testing on NASA Contract NAS9-17249. The test results are presented graphically in the Appendix. The Final Report is a brief discussion of design elements, test results, and a discussion of the latter. The contract was awarded for development and demonstration of design modifications to the NASA Standard Initiator-1 (NSI-1), resulting in the development of NSI-2. The intent of the project was to develop and prove the following design features: (1) Protection from premature detonation due to electrostatic potential by means other than a spark gap; (2) Development of an integral insulated charge cup for use with a zirconium/potassium perchlorate type mixture; (3) Improved cost and reliability figures by the use of a deposited bridge; and (4) Elimination of dudding as a result of the pyrotechnic shock effect, the movement of the primer composition away from the bridge circuit.
Document ID
19880019661
Acquisition Source
Legacy CDMS
Document Type
Contractor Report (CR)
Date Acquired
September 5, 2013
Publication Date
June 1, 1988
Subject Category
Propellants And Fuels
Report/Patent Number
NAS 1.26:172070
NASA-CR-172070
Accession Number
88N29045
Funding Number(s)
CONTRACT_GRANT: NAS9-17249
Distribution Limits
Public
Copyright
Work of the US Gov. Public Use Permitted.
No Preview Available