NASA Logo

NTRS

NTRS - NASA Technical Reports Server

Back to Results
Cost estimating methods for advanced space systemsNASA is responsible for developing much of the nation's future space technology. Cost estimates for new programs are required early in the planning process so that decisions can be made accurately. Because of the long lead times required to develop space hardware, the cost estimates are frequently required 10 to 15 years before the program delivers hardware. The system design in conceptual phases of a program is usually only vaguely defined and the technology used is so often state-of-the-art or beyond. These factors combine to make cost estimating for conceptual programs very challenging. This paper describes an effort to develop parametric cost estimating methods for space systems in the conceptual design phase. The approach is to identify variables that drive cost such as weight, quantity, development culture, design inheritance and time. The nature of the relationships between the driver variables and cost will be discussed. In particular, the relationship between weight and cost will be examined in detail. A theoretical model of cost will be developed and tested statistically against a historical database of major research and development projects.
Document ID
19950014324
Acquisition Source
Legacy CDMS
Document Type
Other
Authors
Cyr, Kelley
(NASA Headquarters Washington, DC United States)
Date Acquired
September 6, 2013
Publication Date
November 1, 1994
Publication Information
Publication: Readings in Program Control
Subject Category
Economics And Cost Analysis
Accession Number
95N20741
Distribution Limits
Public
Copyright
Work of the US Gov. Public Use Permitted.
No Preview Available