NASA Logo

NTRS

NTRS - NASA Technical Reports Server

Back to Results
Emergency Lighting SystemWhen power outages occurred at Landmark Plastic Corporation, it took seven to twelve minutes for the primary mercury lamps to cool down enough to relight and two to seven minutes for the ELS incandescent lamps to relight. Production could not resume for as much as seven minutes. An article in NASA Tech Briefs describing the capabilities of photosensing devices led Landmark employee, Steve Keller to design a system now activated by any voltage loss in the main lamp circuit and coupled with photosensing devices used to keep them on until the primary mercury lamps reach full brightness.
Document ID
20020080084
Acquisition Source
Marshall Space Flight Center
Document Type
Other
Date Acquired
September 7, 2013
Publication Date
January 1, 1994
Publication Information
Publication: Spinoff 1994
ISBN: 0-16-045368-2
Subject Category
Electronics And Electrical Engineering
Distribution Limits
Public
Copyright
Work of the US Gov. Public Use Permitted.
No Preview Available