NASA Logo

NTRS

NTRS - NASA Technical Reports Server

Back to Results
Designing an Alternate Mission Operations Control RoomThe Huntsville Operations Support Center (HOSC) is a multi-project facility that is responsible for 24x7 real-time International Space Station (ISS) payload operations management, integration, and control and has the capability to support small satellite projects and will provide real-time support for SLS launches. The HOSC is a service-oriented/ highly available operations center for ISS payloads-directly supporting science teams across the world responsible for the payloads. The HOSC is required to endure an annual 2-day power outage event for facility preventive maintenance and safety inspection of the core electro-mechanical systems. While complete system shut-downs are against the grain of a highly available sub-system, the entire facility must be powered down for a weekend for environmental and safety purposes. The consequence of this ground system outage is far reaching: any science performed on ISS during this outage weekend is lost. Engineering efforts were focused to maximize the ISS investment by engineering a suitable solution capable of continuing HOSC services while supporting safety requirements. The HOSC Power Outage Contingency (HPOC) System is a physically diversified compliment of systems capable of providing identified real-time services for the duration of a planned power outage condition from an alternate control room. HPOC was designed to maintain ISS payload operations for approximately three continuous days during planned HOSC power outages and support a local Payload Operations Team, International Partners, as well as remote users from the alternate control room located in another building.
Document ID
20140010950
Acquisition Source
Marshall Space Flight Center
Document Type
Conference Paper
Authors
Montgomery, Patty
(NASA Marshall Space Flight Center Huntsville, AL, United States)
Reeves, A. Scott
(Colsa Corp. Huntsville, AL, United States)
Date Acquired
August 25, 2014
Publication Date
May 5, 2014
Subject Category
Ground Support Systems And Facilities (Space)
Report/Patent Number
M14-3499
Report Number: M14-3499
Meeting Information
Meeting: SpaceOps 2014
Location: Pasadena, CA
Country: United States
Start Date: May 5, 2014
End Date: May 9, 2014
Sponsors: American Inst. of Aeronautics and Astronautics
Funding Number(s)
CONTRACT_GRANT: NNM04AA07C
Distribution Limits
Public
Copyright
Public Use Permitted.
No Preview Available