NASA Logo

NTRS

NTRS - NASA Technical Reports Server

Back to Results
DSN test and training system, Mark III-77The Mark III-77 system is configured to support DSN testing and training in preparation for the Mariner-Jupiter-Saturn 1977 and Pioneer-Venus 1978 missions, in addition to the on-going in-flight missions. DSN Test and Trailing System capabilities include functions performed in the Deep Space Stations, Ground Communications Facility, and Network Operations Control Center.
Document ID
19770014168
Acquisition Source
Legacy CDMS
Document Type
Other
Authors
Thornman, H. C.
(Jet Propulsion Lab., California Inst. of Tech. Pasadena, CA, United States)
Date Acquired
August 8, 2013
Publication Date
April 15, 1977
Publication Information
Publication: The Deep Space Network
Subject Category
Ground Support Systems And Facilities (Space)
Accession Number
77N21112
Distribution Limits
Public
Copyright
Work of the US Gov. Public Use Permitted.

Available Downloads

There are no available downloads for this record.
No Preview Available