NASA Logo

NTRS

NTRS - NASA Technical Reports Server

Back to Results
Lessons From the Pioneer Venus ProgramWe began the Pioneer Venus contract in late 1974 with a planned launch of the Orbiter in May 1978 and the Multiprobe in August 1978. Because we had four years, we thought there was plenty of time. As it turned out, we barely made the launch dates. The Orbiter was relatively straightforward, compared to the Multiprobe Bus and Probes that had to survive descent through the harsh Venusian atmosphere. To help overcome our many Multiprobe problems we formed a strong global team. The GE reentry team in Philadelphia, experienced in designing vehicles to enter the earth s atmosphere, was assigned the responsibility for the Probe entry system, including protective heat shielding and parachute design to extract the scienceladen Large Probe pressure vessel and control its descent through the Venusian clouds. Since the Probes had to remain stable as they descended through the Venus atmosphere, we used the aerodynamic expertise at the Hughes Missile Division, NASA s Ames Research Center and the Langley Research Center. Since the pressure at the surface of Venus was equivalent to an ocean depth of 3300 feet, we went to the Navy s David Taylor Research Center for their deepsea expertise. To test the pressure vessel at the high pressure and temperatures anticipated at Venus we went to the only facility capable of simulating the Venus surface environment, the Southwest Research Institute in San Antonio, Texas. We had dozens of subcontractors all over the world. As we developed our design, we began an extensive program to validate the ability of our Probe hardware to withstand the Venus environment. During this testing, we encountered numerous problems, mostly associated with adapting earth-based hardware to operate in the anticipated Venus environment. For example, the Large Probe pressure vessel imploded with a very loud bang the first time we tested its ability to withstand the high pressure and temperature on the Venusian surface. We had to go back and redesign, increasing the pressure vessel wall thickness. In addition, during the first tests of the parachute system, our parachute system ripped apart and had to be redesigned. Finally, at the aptly named test range in Truth or Consequences, New Mexico, we successfully demonstrated the parachute design by drop
Document ID
20070014676
Acquisition Source
Ames Research Center
Document Type
Conference Paper
Authors
Dorfman, Steven D.
(Boeing Satellite Systems, Inc. Los Angeles, CA, United States)
Date Acquired
August 23, 2013
Publication Date
April 1, 2005
Publication Information
Publication: 2nd International Planetary Probe Workshop
Subject Category
Space Sciences (General)
Distribution Limits
Public
Copyright
Public Use Permitted.
No Preview Available