NASA Logo

NTRS

NTRS - NASA Technical Reports Server

Back to Results
Mariner Venus/Mercury '73 - A strategy of cost controlThe Mariner Venus/Mercury '73 project kept within its originally established goals for schedule, performance, and cost. Underlying this development success was the availability of the Mariner technology. But meeting the goals demanded management determination, planning, and discipline to make optimum use of state-of-the-art technology. The present work points out management approaches and techniques that kept schedules and controlled costs, the intent being to stimulate thought about how to do the same with future spacecraft and payloads.
Document ID
19740049570
Acquisition Source
Legacy CDMS
Document Type
Reprint (Version printed in journal)
Authors
Biggs, J. R.
(NASA Office of Space Science and Applications Washington, D.C., United States)
Downhower, W. J.
(California Institute of Technology, Jet Propulsion Laboratory, Pasadena Calif., United States)
Date Acquired
August 7, 2013
Publication Date
June 1, 1974
Publication Information
Publication: Astronautics and Aeronautics
Volume: 12
Subject Category
General
Accession Number
74A32320
Distribution Limits
Public
Copyright
Other

Available Downloads

There are no available downloads for this record.
No Preview Available