NASA Logo

NTRS

NTRS - NASA Technical Reports Server

Back to Results
A description of hardware and mission planning for the Apollo-Soyuz Test ProjectThe Apollo-Soyuz Test Program (ASTP) is scheduled for flight in July 1975. This paper will describe briefly the mission planning and hardware associated with the program. Of interest are modifications to the basic Apollo and Soyuz vehicles as well as the newly developed docking module and docking system. Joint aspects of the mission profile are explained. Science objectives and corresponding experiments are described. Utilization of the ATS-6 Satellite for relay of TV, voice, and data to the ground is also a topic. The paper concludes with a discussion of the joint flight control interface.
Document ID
19750056539
Acquisition Source
Legacy CDMS
Document Type
Conference Proceedings
Authors
Littleton, F. C.
(NASA Johnson Space Center Flight Control Div., Houston, Tex., United States)
Date Acquired
August 8, 2013
Publication Date
January 1, 1975
Subject Category
Launch Vehicles And Space Vehicles
Meeting Information
Meeting: Technology today for tomorrow; Twelfth Space Congress
Location: Cocoa Beach, FL
Start Date: April 9, 1975
End Date: April 11, 1975
Accession Number
75A40611
Distribution Limits
Public
Copyright
Other

Available Downloads

There are no available downloads for this record.
No Preview Available