NASA Logo

NTRS

NTRS - NASA Technical Reports Server

Back to Results
FTS maintenance and calibration at DSS 42/43An FTS maintenance and calibration task was conducted at DSS 42/43 during August 1978. The objectives of this effort were (1) the routine maintenance and calibration of hydrogen masers, (2) installation and calibration of cesium standards, (3) installation of test equipment for frequency measurement, (4) CRG testing, (5) cabling inspection and repair, (6) check thermal and magnetic environment of H-maser/cesium room, and (7) calibration of frequency and timing subsystem.
Document ID
19790010892
Acquisition Source
Legacy CDMS
Document Type
Other
Authors
Dachel, P. R.
(Jet Propulsion Lab., California Inst. of Tech. Pasadena, CA, United States)
Wells, J.
(Jet Propulsion Lab., California Inst. of Tech. Pasadena, CA, United States)
Date Acquired
August 9, 2013
Publication Date
February 15, 1979
Publication Information
Publication: The Deep Space Network
Subject Category
Ground Support Systems And Facilities (Space)
Accession Number
79N19063
Distribution Limits
Public
Copyright
Work of the US Gov. Public Use Permitted.

Available Downloads

There are no available downloads for this record.
No Preview Available