NASA Logo

NTRS

NTRS - NASA Technical Reports Server

Back to Results
NASA payload interface verification requirements - Process and implementationThe separate and combinatorial roles played by NASA and STS payload contractors in the processes of interfacing cargo with the Shuttle are described. NASA personnel aid payload interface verification beginning at the hardware development level and perform independent interface verification once the payload is delivered to the payload processing facility. The cargo is first checked for operational and flight readiness, including inspection of installed devices to specification for the interface connections. Checklists furnished to the user are returned to NASA prior to integration simulation unless formal statements of compliance or waivers are exchanged. The continuance of strict adherence to predelivery interface verification testing is emphasized as necessary for meeting the turnaround times projected for the Orbiter fleet.
Document ID
19830049960
Acquisition Source
Legacy CDMS
Document Type
Conference Paper
Authors
Huffstetler, W. J.
(NASA Lyndon B. Johnson Space Center Houston, TX, United States)
Williams, L. G.
(NASA Johnson Space Center Houston, TX, United States)
Date Acquired
August 11, 2013
Publication Date
January 1, 1982
Subject Category
Ground Support Systems And Facilities (Space)
Meeting Information
Meeting: Aerospace Testing Seminar
Location: Los Angeles, CA
Start Date: March 11, 1981
End Date: March 13, 1981
Sponsors: Aerospace Testing Seminar
Accession Number
83A31178
Distribution Limits
Public
Copyright
Other

Available Downloads

There are no available downloads for this record.
No Preview Available