NASA Logo

NTRS

NTRS - NASA Technical Reports Server

Back to Results
Qualification testing for a central stationQualification testing for a Central Station Photovoltaic (PV) Facility depends to a great extent on the system design, (fixed versus tracking), and the level of data acquisition/control which is incorporated into the system. The basic elements which require qualification tests include: dc power production/collection; tracker conversion systems; ac utility interface; system level control; and data acquisition/reporting. The qualification tests from the Lungo (ARCO) 1 MW Facility which were completed in January 1983 are discussed. The philosophy and many of the procedures are applicable to any central station PV facility.
Document ID
19840024635
Acquisition Source
Legacy CDMS
Document Type
Conference Paper
Authors
Forrester, D. L.
(BDM Corp. Albuquerque, NM, United States)
Date Acquired
August 12, 2013
Publication Date
January 1, 1983
Publication Information
Publication: JPL Proc. of the Flat-Plate Solar Array Proj. Res. Forum on the Design of Flat-Plate Photovoltaic Arrays for Central Sta.
Subject Category
Electronics And Electrical Engineering
Accession Number
84N32706
Distribution Limits
Public
Copyright
Work of the US Gov. Public Use Permitted.

Available Downloads

There are no available downloads for this record.
No Preview Available