NASA Logo

NTRS

NTRS - NASA Technical Reports Server

Back to Results
Reducing the turnaround time for the Shuttle Orbiter main propulsion system at Kennedy Space CenterThis paper presents steps currently being implemented to reduce the processing time of the Orbiter Main Propulsion System. Given the projected increase in launch rates of the Space Transportation System (STS) in the operational era, average turnaround time from arrival at Kennedy Space Center to subsequent launch will have to be significantly reduced. In many STS flows to date, a pacing system has been the Main Propulsion System consisting of the three Space Shuttle Main Engines (SSME's) and the Main Propulsion Subsystem (MPS) connecting the SSME's to the Orbiter/ground and Orbiter/External Tank interfaces. This paper summarizes procedural, hardware, software, and requirements changes being incorporated at Kennedy Space Center (KSC) to reduce the processing time required for the MPS/SSME systems. Specific examples from each category are cited to illustrate the impact of the improvements on MPS/SSME processing.
Document ID
19840028158
Acquisition Source
Legacy CDMS
Document Type
Conference Paper
Authors
Bilardo, V. J., Jr.
(NASA Kennedy Space Center Cocoa Beach, FL, United States)
Date Acquired
August 12, 2013
Publication Date
January 1, 1983
Subject Category
Space Transportation
Report/Patent Number
AIAA PAPER 83-2623
Accession Number
84A10945
Distribution Limits
Public
Copyright
Other

Available Downloads

There are no available downloads for this record.
No Preview Available