NASA Logo

NTRS

NTRS - NASA Technical Reports Server

Back to Results
Recertification analysis and inspection planning for environmental test facilitiesProgram development and implementation for recertification of pressure vessels used at NASA facilities are outlined, together with inspection procedures. The recertification is carried out in three phases: analysis, inspection planning, and long term inspection plans and management. A data base was developed for each piece of equipment and the associated performance parameters. Either documentation was obtained or NDT was performed on the vessels to confirm design and Code compliance. A Failure Modes and Effects Analysis technique was used to target recurring inspection items and guidelines were drawn up for inspections of parts and systems and intervals between inspections. The steps taken in establishing the program are considered applicable in both research and industrial situations.
Document ID
19840057465
Acquisition Source
Legacy CDMS
Document Type
Reprint (Version printed in journal)
Authors
Rebeck, K. J.
(NASA Goddard Space Flight Center Greenbelt, MD, United States)
Danna, R.
(NASA Goddard Space Flight Center Greenbelt, MD, United States)
Miller, G. S.
(General Physics Corp. Columbia, MD, United States)
Hollingsworth, R. T.
(NASA Goddard Space Flight Center Greenbelt, MD, United States)
Date Acquired
August 12, 2013
Publication Date
June 1, 1984
Publication Information
Publication: Journal of Environmental Sciences
Volume: 27
ISSN: 0022-0906
Subject Category
Quality Assurance And Reliability
Accession Number
84A40252
Distribution Limits
Public
Copyright
Other

Available Downloads

There are no available downloads for this record.
No Preview Available