NASA Logo

NTRS

NTRS - NASA Technical Reports Server

Back to Results
PLAN-IT - Scheduling assistant for solar system explorationA frame-based expert scheduling system shell, PLAN-IT, is developed for spacecraft scheduling in the Request Integration Phase, using the Comet Rendezvous Asteroid Flyby (CRAF) mission as a development base. Basic, structured, and expert scheduling techniques are reviewed. Data elements such as activity representation and resource conflict representation are discussed. Resource constraints include minimum and maximum separation times between activities, percentage of time pointed at specific targets, and separation time between targeted intervals of a given activity. The different scheduling technique categories and the rationale for their selection are also considered.
Document ID
19880033260
Acquisition Source
Legacy CDMS
Document Type
Reprint (Version printed in journal)
Authors
Dias, William C.
(ITT Federal Electric Corp. Vandenberg AFB, CA, United States)
Henricks, Julia A.
(ITT Federal Electric Corp. Vandenberg AFB, CA, United States)
Wong, Jennifer C.
(California Institute of Technology Jet Propulsion Laboratory, Pasadena, United States)
Date Acquired
August 13, 2013
Publication Date
January 1, 1987
Publication Information
Publication: Telematics and Informatics
Volume: 4
Issue: 4, 19
ISSN: 0736-5853
Subject Category
Systems Analysis
Accession Number
88A20487
Distribution Limits
Public
Copyright
Other

Available Downloads

There are no available downloads for this record.
No Preview Available