NASA Logo

NTRS

NTRS - NASA Technical Reports Server

Back to Results
Advanced Launch System (ALS) actuation and power systems impact operability and costTo obtain the Advanced Launch System (ALS) primary goals of reduced costs and improved operability, there must be significant reductions in the launch operations and servicing requirements relative to current vehicle designs and practices. One of the primary methods for achieving these goals is by using vehicle electrical power system and controls for all actuation and avionics requirements. A brief status review of the ALS and its associated Advanced Development Program is presented to demonstrate maturation of those technologies that will help meet the overall operability and cost goals. The electric power and actuation systems are highlighted as a specific technology ready not only to meet the stringent ALS goals (cryogenic field valves and thrust vector controls with peak power demands to 75 hp), but also those of other launch vehicles, military and civilian aircraft, lunar/Martian vehicles, and a multitude of commercial applications.
Document ID
19900065900
Acquisition Source
Legacy CDMS
Document Type
Reprint (Version printed in journal)
External Source(s)
Authors
Sundberg, Gale R.
(NASA Lewis Research Center Cleveland, OH, United States)
Date Acquired
August 14, 2013
Publication Date
September 1, 1990
Publication Information
Publication: IEEE Aerospace and Electronic Systems Magazine
Volume: 5
ISSN: 0885-8985
Subject Category
Spacecraft Propulsion And Power
Accession Number
90A52955
Distribution Limits
Public
Copyright
Other

Available Downloads

There are no available downloads for this record.
No Preview Available