NASA Logo

NTRS

NTRS - NASA Technical Reports Server

Back to Results
Space Station Freedom - Approaching the critical design phaseThe status and future developments of the Space Station Freedom are discussed. To date detailed design drawings are being produced to manufacture SSF hardware. A critical design review (CDR) for the man-tended capability configuration is planned to be performed in 1993 under the SSF program. The main objective of the CDR is to enable the program to make a full commitment to proceed to manufacture parts and assemblies. NASA recently signed a contract with the Russian space company, NPO Energia, to evaluate potential applications of various Russian space hardware for on-going NASA programs.
Document ID
19920074488
Acquisition Source
Legacy CDMS
Document Type
Conference Paper
Authors
Kohrs, Richard H.
(NASA Headquarters Washington, DC United States)
Huckins, Earle, III
(NASA Headquarters Washington, DC United States)
Date Acquired
August 15, 2013
Publication Date
August 1, 1992
Subject Category
Astronautics (General)
Report/Patent Number
IAF PAPER 92-0680
Accession Number
92A57112
Distribution Limits
Public
Copyright
Other

Available Downloads

There are no available downloads for this record.
No Preview Available