NASA Logo

NTRS

NTRS - NASA Technical Reports Server

Back to Results
Initial accomplishments of the Environmental Control and Life Support System (ECLSS) atmosphere revitalization (AR) predevelopment operational system test (POST) for the Space Station Freedom (SSF)Initial results of the integrated AR POST conducted by Boeing at Marshall Space Flight Center in 1992 are presented. The three baselined ECLSS Man Tended Capability AR assemblies were integrated and operated in a closed door chamber in which the internal atmosphere was monitored. The test provides a prerequisite checkout of the AR subsystem in preparation for longer duration tests in which the AR subsystem will be integrated with the Water Recovery Management subsystem. The integrated AR POST will serve as an early test bed to evaluate the integration of the space station ECLSS AR subsystem during design maturation.
Document ID
19930057368
Acquisition Source
Legacy CDMS
Document Type
Conference Paper
Authors
Dunn, Kevin H.
(NASA Marshall Space Flight Center Huntsville, AL, United States)
Bulgajewski, Peter J.
(Boeing Defense & Space Group Huntsville, AL, United States)
Date Acquired
August 16, 2013
Publication Date
July 1, 1992
Subject Category
Man/System Technology And Life Support
Report/Patent Number
SAE PAPER 921186
Meeting Information
Meeting: SAE, International Conference on Environmental Systems
Location: Seattle, WA
Country: United States
Start Date: July 13, 1992
End Date: July 16, 1992
Sponsors: SAE
Accession Number
93A41365
Funding Number(s)
CONTRACT_GRANT: NAS8-50000
Distribution Limits
Public
Copyright
Other

Available Downloads

There are no available downloads for this record.
No Preview Available