EOS distributed planning and scheduling prototypeSome of the more significant lessons learned during the development of the Earth Observing System (EOS) Distributed Planning and Scheduling Prototype are presented. The need for a central scheduler is not demonstrated. A mapping of scheduling and conflict-resolution responsibility across the nodes of the EOS distributed scheduling system is developed and shown to be both feasible and appropriate. Complex instrument scheduling is mostly accomplished at the ICC/IST (instrument control center/instrumental support terminal) with 'slidable' flexibility for slews and some kinds of calibrations resolved at the EOS Operations Center (EOC). All nodes have full visibility interinstrument contention for resource and environmental rights, e.g., vibration, thermal, and electromagnetic. The EOC assigns, by activity, initial action responsibility for conflict resolution to a node which is party to the conflict. Most interinstrument conflicts are resolved by the ICCs and ISTs during an intermediate scheduling phase while the EOC is negotiating a TDRS schedule with the NCC.
Document ID
19940034854
Acquisition Source
Legacy CDMS
Document Type
Conference Paper
Authors
Hull, Larry G.
(NASA Goddard Space Flight Center Greenbelt, MD, United States)
Peters, Stephen F.
(JPL Pasadena, CA, United States)
Davis, Randy
(Colorado Univ. Boulder, United States)
Date Acquired
August 16, 2013
Publication Date
January 1, 1993
Publication Information
Publication: In: AIAA Computing in Aerospace Conference, 9th, San Diego, CA, Oct. 19-21, 1993, Technical Papers. Pt. 2 (A94-11401 01-62)
Publisher: American Institute of Aeronautics and Astronautics
Subject Category
Astronautics (General)
Report/Patent Number
AIAA PAPER 93-4629
Accession Number
94A11509
Distribution Limits
Public
Copyright
Other

Available Downloads

There are no available downloads for this record.
No Preview Available