NASA Logo

NTRS

NTRS - NASA Technical Reports Server

Back to Results
Calibration and postlaunch performance of the Meteor 3/TOMS instrumentPrelaunch and postlaunch calibration results for the Meteor 3/total ozone mapping spectrometer (TOMS) instrument are presented here. Ozone amounts are retrieved from measurements of Earth albedo in the 312- to 380-nm range. The accuracy of albedo measurements is primarily tied to knowledge of the reflective properties of diffusers used in the calibrations and to the instrument's wavelength selection. These and other important prelaunch calibrations are presented. Their estimated accuracies are within the bounds necessary to determine column ozone to better than 1%. However, postlaunch validation results indicate some prelaunch calibration uncertainties may be larger than originally estimated. Instrument calibrations have been maintained postlaunch to within a corresponding 1% error in retrieved ozone. Onboard calibrations, including wavelength monitoring and a three-diffuser solar measurement system, are described and specific results are presented. Other issues, such as the effects of orbital precession on calibration and recent chopper wheel malfunctions, are also discussed.
Document ID
19950044659
Acquisition Source
Legacy CDMS
Document Type
Reprint (Version printed in journal)
External Source(s)
Authors
Jaross, G.
(Hughes STX Corp. Greenbelt, MD, United States)
Krueger, A.
(NASA Goddard Space Flight Center Greenbelt, MD, United States)
Cebula, R. P.
(Hughes STX Corp. Greenbelt, MD, United States)
Seftor, C.
(Hughes STX Corp. Greenbelt, MD, United States)
Hartmann, U.
(Orbital Sciences Corp. Pomona, CA, United States)
Haring, R.
(Orbital Sciences Corp. Pomona, CA, United States)
Burchfield, D.
(Orbital Sciences Corp. Pomona, CA, United States)
Date Acquired
August 16, 2013
Publication Date
February 20, 1995
Publication Information
Publication: Journal of Geophysical Research
Volume: 100
Issue: D2
ISSN: 0148-0227
Subject Category
Instrumentation And Photography
Accession Number
95A76258
Funding Number(s)
CONTRACT_GRANT: NAS5-31755
Distribution Limits
Public
Copyright
Other

Available Downloads

There are no available downloads for this record.
No Preview Available