NASA Logo

NTRS

NTRS - NASA Technical Reports Server

Back to Results
STS-103 Crew Activities Report: Flight Day 7 HighlightsToday Discovery's astronauts begin preparing the spacecraft for it's scheduled return to Earth by checking out the flight control system and reaction control jets that support re-entry. Later in the day the astronauts begin stowing equipment used during the past week and start buttoning up on-orbit systems. The Ku-band antenna which provides most of the capacity for data and television relay was stowed around 8:45 p.m. The recently refurbished Hubble Space Telescope moves slowly through it's checkout sequence before resuming science operations. Both the flight control system (FCS) and the reaction control jets (RCS) were without issue, with all systems ready to support Discovery's return to Earth.
Document ID
20000010639
Acquisition Source
Johnson Space Center
Document Type
Video
Date Acquired
August 19, 2013
Publication Date
December 28, 1999
Subject Category
Space Transportation And Safety
Report/Patent Number
BRF-1420G
NONP-NASA-VT-2000001113
Distribution Limits
Public
Copyright
Work of the US Gov. Public Use Permitted.

Available Downloads

There are no available downloads for this record.
No Preview Available