NASA Logo

NTRS

NTRS - NASA Technical Reports Server

Back to Results
Shuttle Shaping UpMeasures to sharply curtail ana document potentially fatal launch debris similar to that which doomed Columbia and her crew should allow the space shuttle to resume flights as early as May. But it could take up to two years before a fully certified thermal protection system and wing leading edge in-orbit repair capability is ready, shuttle managers say. The overall positive safety tradeoffs, however, are enabling return-to-flight preparations to accelerate this month toward making a serious run at launching the shuttle back to space by spring.
Document ID
20040200742
Acquisition Source
Kennedy Space Center
Document Type
Reprint (Version printed in journal)
Authors
Covault, Craig
(NASA Kennedy Space Center Cocoa Beach, FL, United States)
Date Acquired
August 22, 2013
Publication Date
December 13, 2004
Publication Information
Publication: Aviation Week and Space Technology
Volume: 161
Issue: 23
Subject Category
Instrumentation And Photography
Distribution Limits
Public
Copyright
Other

Available Downloads

There are no available downloads for this record.
No Preview Available