NASA Logo

NTRS

NTRS - NASA Technical Reports Server

Back to Results
STS-114: Discovery Launch Postponement Press BriefingThis press briefing addresses the problem that occurred prior to the launch of the STS-114. Dean Acosta, Deputy Assistant Administrator of Public Affairs, introduces the panel which consists of Dr. Michael Griffin, NASA Administrator, William Readdy, Associate Administrator for Space Operations, Wayne Hale, Space Shuttle Program Deputy Manager, Steve Poulas, Orbiter Project Manager, Mike Leinbach, NASA Launch Director, and Bill Parsons, Space Shuttle Program Manager. Wayne Hale expresses that a problem occurred with one of the low level sensors in the hydrogen tank and that the cause of the problem must be identified and rectified. Steve Poulos talks about establishing a troubleshooting plan as a part of the scrub effort and Mike Leinbach describes the process of draining the external tank. Wayne Hale answers questions about the sensors and if the Space Shuttle Discovery is safe to fly and Steve Poulos answers questions about the possible suspects for this problem.
Document ID
20050207328
Acquisition Source
Kennedy Space Center
Document Type
Video
Date Acquired
August 23, 2013
Publication Date
July 13, 2005
Subject Category
Space Transportation And Safety
Distribution Limits
Public
Copyright
Work of the US Gov. Public Use Permitted.

Available Downloads

There are no available downloads for this record.
No Preview Available