STS-114: Discovery Day 6 Post MMT MeetingWayne Hale, Space Shuttle Deputy Program Manager and Steve Poulos, Orbiter Program Manager, discuss the damage assessment from the tiles that came off the Space Shuttle Discovery during launch. Poulos presents charts and discusses in detail the following topics: 1) Composite Tile Damage/Gap Filler Sites Evaluation; 2) Protruding Ceramic Shim Aft of the Nose Landing Gear Door (NLGD); 3) Protruding Chine Gap Filler; 4) RH NLGD Tile Damage; 5) RH NLGD Damage Analysis; 6) Left Wing Tile Damage; 7) Comparison of Ground Test Results vs. FD5 Focused Inspection; 8) Current Status: Focused Inspection 721L07-01 ITVC FD5 Image of Panel 7L Apex 9) Current Status: Focused Inspection Lower Panel 7L721L07-02; 10) Current Status Focused Inspection 721L10-02 Lower Panel 10L Close-up view; and 11) Window 1 Blanket. The presentation ends with a question and answer period from the news media.