STS-114: Discovery Flight Day 7 Post MMT MeetingWayne Hale Space Shuttle Deputy Program Manager, and Chuck Campbell Subsystem Engineer in Aerothermodynamics are seen in this post mission management teem briefing on this seventh day of space flight. Wayne Hale begins with talking about how the International Space Station has been resupplied with its necessities, and that the Control Moment Gyroscope (CSG) has been replaced. Hale expresses his concern about the health of the Space Shuttle Discovery with the two protruding gap fillers present, and the aerothermodynamics surrounding the gap fillers. These concerns led to the conclusion to have spacewalker Stephen Robinson remove the gap fillers during EVA-3. Campbell shows a video of the protruding gap filler aft of Nose Landing Gear Door (NLGD). Campbell and Hale answer questions from the news media about the risks of performing this spacewalk, boundary layer transitions, flight safety, inspections, and temperature concerns.