NASA Logo

NTRS

NTRS - NASA Technical Reports Server

Back to Results
STS-1: Columbia Complete MissionA video presentation of the STS-1 Columbia Mission is shown. The video begins with footage of the STS-1 Columbia arriving at Kennedy Space Center on March 24, 1979. The various milestones that were shown include: 1) STS-1 Columbia Shuttle Rocket Booster (SRB) stacking; 2) External Tank (ET) lift and mating; 3) Move to VAB and Mating; 4) Rollout to pad 39A; 5) Flight Readiness Firing (FRF) on February 19, 1981; 6) Launch day; and 7) Return to Kennedy Space Center. John W. Young, Commander and Robert L. Crippen, Pilot are shown having a traditional breakfast before the suit up and drive out to the launch pad. Footage of the lift-off along with Shuttle Rocket Booster (SRB) separation is shown. After lift-off, there is a shot of the crew in the mid-deck and also a view of thunderstorms over the Amazon Basin. The video ends with a view of Columbia returning to Kennedy Space Center on April 25, 1981.
Document ID
20060026104
Acquisition Source
Kennedy Space Center
Document Type
Video
Date Acquired
August 23, 2013
Publication Date
April 14, 1981
Subject Category
Space Transportation And Safety
Distribution Limits
Public
Copyright
Work of the US Gov. Public Use Permitted.

Available Downloads

There are no available downloads for this record.
No Preview Available