NASA Logo

NTRS

NTRS - NASA Technical Reports Server

Back to Results
Space Shuttle Program Update News Conference with Wayne HaleJessica Rye from NASA Public Affairs introduces: Wayne Hale, Space Shuttle Deputy Program Manager; Mike Leinbach, NASA Launch Director; and Tim Wilson, from the NASA Engineering and Safety Center. Hale begins the discussion with a video showing the following processes: 1) Changing of gap fillers at Orbiter Processing Facility; 2) The Orbiter Boom Sensor System (OBSS) being loaded into Discovery payload bay; 3) Engine installation; 4) Spacecrew at Michoud Assembly observing the area where the PAL ramps were removed; 5) Test being performed to mitigate liquid air forming underneath foam; and 6) Roll out of ET119 from New Orleans. Hale also presents a slide of the ET debris Mitigation Activities and ET Ice/Frost Ramps. Mike Leinbach says that Kennedy Space Center is ready to receive the tank and that he is ready to get on with the mission. Tim Wilson heads the team to resolve foam loss issues which is his primary goal before this flight. A question and answer period follows.
Document ID
20060026276
Acquisition Source
Kennedy Space Center
Document Type
Video
Date Acquired
August 23, 2013
Publication Date
February 28, 2006
Subject Category
Space Transportation And Safety
Distribution Limits
Public
Copyright
Work of the US Gov. Public Use Permitted.

Available Downloads

There are no available downloads for this record.
No Preview Available