NASA Logo

NTRS

NTRS - NASA Technical Reports Server

Back to Results
The DAWN Project's Transition to Mission Operations: on Its Way to Rendezvous with (4) Vesta and (1) CeresDawn launched on 27 September 2007 on a mission to orbit main belt asteroids (4) Vesta in 2011 - 2012 and (1) Ceres in 2015. The operations team conducted an extensive set of assessments of the engineering subsystems and science instruments during the first 80 days of the mission. A major objective of this period was to thrust for one week with the ion propulsion system to verify flight and ground systems readiness for typical interplanetary operations. Upon successful conclusion of the checkout phase, the interplanetary cruise phase began, most of which will be devoted to thrusting. The flexibility afforded by the use of ion propulsion enabled the project to accommodate a launch postponement of more than 3 months caused by a combination of launch vehicle and tracking system readiness, unfavorable weather, and then conflicts with other launches. Even with the shift in the launch date, all of the science objectives are retained with the same schedule and greater technical margins. This paper describes the conclusion of the development phase of the project, launch operations, and the progress of mission operations.
Document ID
20090007568
Acquisition Source
Jet Propulsion Laboratory
Document Type
Conference Paper
External Source(s)
Authors
Rayman, Marc D.
(Jet Propulsion Lab., California Inst. of Tech. Pasadena, CA, United States)
Patel, Keyur C.
(Jet Propulsion Lab., California Inst. of Tech. Pasadena, CA, United States)
Date Acquired
August 24, 2013
Publication Date
September 29, 2008
Subject Category
Launch Vehicles And Launch Operations
Report/Patent Number
IAC-08-A3.5.2
Meeting Information
Meeting: 59th International Astronautical Congress
Location: Glasgow, Scotland
Country: United Kingdom
Start Date: September 28, 2008
End Date: October 3, 2008
Distribution Limits
Public
Copyright
Other
Keywords
launch operations
project development
mission operations
Dawn

Available Downloads

There are no available downloads for this record.
No Preview Available