NASA Logo

NTRS

NTRS - NASA Technical Reports Server

Back to Results
Planning and Estimation of Operations Support RequirementsLife Cycle Cost (LCC) estimates during the proposal and early design phases, as well as project replans during the development phase, are heavily focused on hardware development schedules and costs. Operations (phase E) costs are typically small compared to the spacecraft development and test costs. This, combined with the long lead time for realizing operations costs, can lead to de-emphasizing estimation of operations support requirements during proposal, early design, and replan cost exercises. The Discovery and New Frontiers (D&NF) programs comprise small, cost-capped missions supporting scientific exploration of the solar system. Any LCC growth can directly impact the programs' ability to fund new missions, and even moderate yearly underestimates of the operations costs can present significant LCC impacts for deep space missions with long operational durations. The National Aeronautics and Space Administration (NASA) D&NF Program Office at Marshall Space Flight Center (MSFC) recently studied cost overruns and schedule delays for 5 missions. The goal was to identify the underlying causes for the overruns and delays, and to develop practical mitigations to assist the D&NF projects in identifying potential risks and controlling the associated impacts to proposed mission costs and schedules. The study found that 4 out of the 5 missions studied had significant overruns at or after launch due to underestimation of the complexity and supporting requirements for operations activities; the fifth mission had not launched at the time of the mission. The drivers behind these overruns include overly optimistic assumptions regarding the savings resulting from the use of heritage technology, late development of operations requirements, inadequate planning for sustaining engineering and the special requirements of long duration missions (e.g., knowledge retention and hardware/software refresh), and delayed completion of ground system development work. This paper updates the D&NF LCC study, looking at the operations (phase E) cost drivers in more detail and extending the study to include 2 additional missions and identifies areas for increased emphasis by project management in order to improve the fidelity of operations estimates.
Document ID
20110006923
Acquisition Source
Marshall Space Flight Center
Document Type
Conference Paper
Authors
Newhouse, Marilyn E.
(CSC Professional Services Group Falls Church, VA, United States)
Barley, Bryan
(NASA Marshall Space Flight Center Huntsville, AL, United States)
Bacskay, Allen
(NASA Marshall Space Flight Center Huntsville, AL, United States)
Clardy, Dennon
(NASA Marshall Space Flight Center Huntsville, AL, United States)
Date Acquired
August 25, 2013
Publication Date
April 25, 2010
Subject Category
Economics And Cost Analysis
Report/Patent Number
M10-0396
M09-0686
M10-0597
Meeting Information
Meeting: SpaceOps 2010 Conference: Delivering on the Dream
Location: Huntsville, AL
Country: United States
Start Date: April 25, 2010
End Date: April 30, 2010
Sponsors: American Inst. of Aeronautics and Astronautics
Funding Number(s)
CONTRACT_GRANT: NAS8-02060
Distribution Limits
Public
Copyright
Public Use Permitted.
No Preview Available