Cost-Benefit Analysis For Alternative Low-Emission Surface Preparation/ Depainting Technologies for Structural SteelStennis Space Center (SSC), Kennedy Space Center (KSC) and Air Force Space Command (AFSPC) identified particulate emissions and waste generated from the depainting process of steel structures as hazardous materials to be eliminated or reduced. A Potential Alternatives Report, Potential Alternatives Report for Validation of Alternative Low Emission Surface Preparation/Depainting Technologies for Structural Steel, provided a technical analyses of identified alternatives to the current coating removal processes, criteria used to select alternatives for further analysis, and a list of those alternatives recommended for testing. The initial coating removal alternatives list was compiled using literature searches and stakeholder recommendations. The involved project participants initially considered approximately 13 alternatives. In late 2003, core project members selected the following depainting processes to be further evaluated: (1) Plastic Blast Media-Quickstrip(R)-A. (2) Hard Abrasive-Steel-Magic(R). (3) Sponge Blasting-Sponge-Jet(R). (4) Liquid Nitrogen-NItroJet(R). (5) Mechanical Removal with Vacuum Attachment-DESCO and OCM Clean-Air (6) Laser Coating Removal Alternatives were tested in accordance with the Joint Test Protocol for Validation of Alternative Low-Emission Surface Preparation/Depainting Technologies for Structural Steel, and the Field Evaluation Test Plan for Validation of Alternative Low-Emission Surface Preparation/Depainting Technologies for Structural Steel. Results of the testing are documented in the Joint Test Report. This Cost-Benefit Analysis (CBA) focuses on the three alternatives (Quickstrip(R)-A, SteelMagic (R), and Sponge-Jet(R)) that were considered viable alternatives for large area operations based on the results of the field demonstration and lab testing. This CBA was created to help participants determine if implementation of the candidate alternatives is economically justified. Each of the alternatives examined reduced Environmental Activity (EA) Costs-those costs associated with complying with environmental regulations. One alternative, Steel-Magic(R), also showed reduced Direct Costs and reduced total costs.
Document ID
20110011118
Acquisition Source
Kennedy Space Center
Document Type
Other
Authors
Lewis, Pattie (International Trade Bridge, Inc. Beavercreek, OH, United States)