NASA Logo

NTRS

NTRS - NASA Technical Reports Server

Back to Results
Reducing NPR 7120.5D to Practice: Transitioning from Design Reviews to the SIR Hardware ReviewThe Gravity Recovery And Interior Laboratory (GRAIL) mission was the first Jet Propulsion Laboratory (JPL) project initiated under NASA's revised rules for space flight project management, NPR 7120.5D, "NASA Space Flight Program and Project Management Requirements." NASA selected GRAIL through a competitive Announcement of Opportunity process and funded its Phase B Preliminary Design effort. The team's first major milestone was a JPL institutional milestone, the Project Mission System Review (PMSR), which proved an excellent tune-up for the end-of-Phase-B NASA life-cycle review, the Preliminary Design Review (PDR). Building on JPL experience on the Prometheus and Juno projects, the team successfully organized for and conducted these reviews on an aggressive schedule. For the Project Critical Design Review (CDR), lessons learned from the PDR and updated Standing Review Board (SRB) practices from the Agency were factored into the review preparation effort. Additionally, the review was held at the Principal Investigator's institution, the Massachusetts Institute of Technology, rather than at the project management center (JPL), which necessitated additional cross-country coordination steps. The PMSR, PDR, and CDR were design reviews and largely paper-oriented. For the System Integration Review (SIR), the project needed to transition to a hardware review and deal with paper in a very different manner. While many of the practices employed for the design reviews were modified and retained (e.g., review preparation team, gate products management, pre-reviews, SRB coordination), the review agenda, presentation style, and slide templates were significantly changed. A key success factor concerned the handling of project open paper, which was succinctly and effectively communicated to the SRB in presentations.This paper provides a brief overview of the GRAIL mission and its project management challenges, provides a detailed description of project SIR preparation and execution activities, including positive and negative lessons learned and identifies recommendations for future NASA (and non- NASA) project teams.
Document ID
20110015586
Acquisition Source
Jet Propulsion Laboratory
Document Type
Conference Paper
External Source(s)
Authors
Taylor, Randall
(Jet Propulsion Lab., California Inst. of Tech. Pasadena, CA, United States)
Date Acquired
August 25, 2013
Publication Date
March 5, 2011
Publication Information
ISBN: 978-1-4244-7351-9
Subject Category
Spacecraft Design, Testing And Performance
Report/Patent Number
IEEEAC Paper 1252
Meeting Information
Meeting: 2011 IEEE Aerospace Conference
Location: Big Sky, MT
Country: United States
Start Date: March 5, 2011
End Date: March 12, 2011
Sponsors: Institute of Electrical and Electronics Engineers
Distribution Limits
Public
Copyright
Other
Keywords
NPR 7120.5D
Reviews, System Integration Review

Available Downloads

There are no available downloads for this record.
No Preview Available