NASA Logo

NTRS

NTRS - NASA Technical Reports Server

Back to Results
The U.S. Rosetta Project: Preparations for Prime Mission, 2014In 2014, the International Rosetta mission will place a spacecraft in orbit around comet 67P/Churyumov-Gerasimenko and deliver a lander to the comet's surface. The National Aeronautics and Space Administration's (NASA) contribution to the International Rosetta mission, designated the U.S. Rosetta Project, includes several instruments, tracking support, and science support for some non-US payloads. In July 2011 the spacecraft was placed in a long-duration hibernation mode planned to last approximately 37 months to conserve electrical power. Rosetta will rendezvous with 67P/Churyumov-Gerasimenko in 2014. On the eve of the mission's arrival at its target, this paper highlights three issues related to Rosetta's looming prime mission: (A) measures taken in 2009 to prepare the US Rosetta Project for the long-duration hibernation mode; (B) risk reviews conducted in 2013 to prepare the US Rosetta Project for exit from hibernation; (C) ESA and NASA preparations for use of NASA Deep Space Network (DSN) assets related to keyword files.
Document ID
20150008670
Acquisition Source
Jet Propulsion Laboratory
Document Type
Conference Paper
External Source(s)
Authors
Alexander, C.
(Jet Propulsion Lab., California Inst. of Tech. Pasadena, CA, United States)
Chmielewski, A.
(Jet Propulsion Lab., California Inst. of Tech. Pasadena, CA, United States)
Aguinaldo, A. M.
(Jet Propulsion Lab., California Inst. of Tech. Pasadena, CA, United States)
Ko, A.
(Jet Propulsion Lab., California Inst. of Tech. Pasadena, CA, United States)
Accomazzo, A.
(European Space Agency. European Space Operations Center Darmstadt, Germany)
Taylor, M. G. G.
(European Space Agency. European Space Research and Technology Center, ESTEC Noordwijk, Netherlands)
Date Acquired
May 21, 2015
Publication Date
March 1, 2014
Subject Category
Lunar And Planetary Science And Exploration
Meeting Information
Meeting: 2014 IEEE Aerospace Conference
Location: Big Sky, MT
Country: United States
Start Date: March 1, 2014
End Date: March 8, 2014
Sponsors: Institute of Electrical and Electronics Engineers
Distribution Limits
Public
Copyright
Other
Keywords
hibernation
risk review
DSN
DKFs

Available Downloads

There are no available downloads for this record.
No Preview Available