NASA Logo

NTRS

NTRS - NASA Technical Reports Server

Back to Results
Technology Cost and Schedule Estimation (TCASE) Final ReportDuring the 2014-2015 project year, the focus of the TCASE project has shifted from collection of historical data from many sources to securing a data pipeline between TCASE and NASA's widely used TechPort system. TCASE v1.0 implements a data import solution that was achievable within the project scope, while still providing the basis for a long-term ability to keep TCASE in sync with TechPort. Conclusion: TCASE data quantity is adequate and the established data pipeline will enable future growth. Data quality is now highly dependent the quality of data in TechPort. Recommendation: Technology development organizations within NASA should continue to work closely with project/program data tracking and archiving efforts (e.g. TechPort) to ensure that the right data is being captured at the appropriate quality level. TCASE would greatly benefit, for example, if project cost/budget information was included in TechPort in the future.
Document ID
20160000761
Acquisition Source
Langley Research Center
Document Type
Other
Authors
Wallace, Jon
(SpaceWorks Engineering, Inc Atlanta, GA, United States)
Schaffer, Mark
(SpaceWorks Engineering, Inc Atlanta, GA, United States)
Date Acquired
January 13, 2016
Publication Date
September 19, 2015
Subject Category
Economics And Cost Analysis
Engineering (General)
Report/Patent Number
NF1676L-22738
Funding Number(s)
CONTRACT_GRANT: NNL11AA05B
WBS: WBS 934844.01.03.04
TASK: NNL14AB99T
Distribution Limits
Public
Copyright
Public Use Permitted.
No Preview Available