NASA Logo

NTRS

NTRS - NASA Technical Reports Server

Back to Results
Mobile Launch Platform Vehicle Assembly Building Area (SWMU 056) Hot Spot 3 Bioremediation Interim Measures Work Plan, Kennedy Space Center, FloridaThis Interim Measures Work Plan (IMWP) presents an approach and design for the remediation of chlorinated volatile organic compound (CVOC) groundwater impacts using bioremediation (biostimulation and bioaugmentation) in Hot Spot 3, which is defined by the area where CVOC (trichloroethene [TCE], cis-1,2-dichloroethene [cDCE], and vinyl chloride [VC]) concentrations are greater than 10 times their respective Florida Department of Environmental Protection (FDEP) Natural Attenuation Default Concentration (NADC) [10xNADC] near the western Mobile Launch Platform (MLP) structure. The IM treatment area is the Hot Spot 3 area, which is approximately 0.07 acres and extends from approximately 6 to 22 and 41 to 55 feet below land surface (ft BLS). Within Hot Spot 3, a source zone (SZ; area with TCE concentrations greater than 1% solubility [11,000 micrograms per liter (micrograms/L)]) was delineated and is approximately 0.02 acres and extends from approximately 6 to 16 and 41 to 50 ft BLS.
Document ID
20160006643
Acquisition Source
Kennedy Space Center
Document Type
Other
Authors
Whitney L. Morrison
(Geosyntec Consultants, Inc. Pensacola, FL, United States)
Daprato, Rebecca C.
(Geosyntec Consultants, Inc. Pensacola, FL, United States)
Date Acquired
May 26, 2016
Publication Date
May 24, 2016
Subject Category
Environment Pollution
Report/Patent Number
KSC-E-DAA-TN32165
Funding Number(s)
CONTRACT_GRANT: NNK12CA13
CONTRACT_GRANT: NNK12CA13B
Distribution Limits
Public
Copyright
Public Use Permitted.
Keywords
MLPV
Bioremediation
Interim Measures
No Preview Available