NASA Logo

NTRS

NTRS - NASA Technical Reports Server

Back to Results
Coal gasification systems engineering and analysis. Appendix H: Work breakdown structureA work breakdown structure (WBS) is presented which encompasses the multiple facets (hardware, software, services, and other tasks) of the coal gasification program. The WBS is shown to provide the basis for the following: management and control; cost estimating; budgeting and reporting; scheduling activities; organizational structuring; specification tree generation; weight allocation and control; procurement and contracting activities; and serves as a tool for program evaluation.
Document ID
19810009696
Acquisition Source
Legacy CDMS
Document Type
Contractor Report (CR)
Date Acquired
September 4, 2013
Publication Date
December 31, 1980
Subject Category
Propellants And Fuels
Report/Patent Number
BDM/H-80-800-TR-APP-H
NASA-CR-161662
Report Number: BDM/H-80-800-TR-APP-H
Report Number: NASA-CR-161662
Accession Number
81N18221
Funding Number(s)
CONTRACT_GRANT: NAS8-33824
Distribution Limits
Public
Copyright
Work of the US Gov. Public Use Permitted.
No Preview Available