NASA Logo

NTRS

NTRS - NASA Technical Reports Server

Back to Results
Status of the 4 MW WTS-4 wind turbineThe WTS-4 is a four-megawatt, horizontal-axis wind turbine presently being fabricated for the U.S. Department of Interior, Bureau of Reclamation, by United Technologies' Hamilton Standard division. This unit, called the System Verification Unit (SVU) will be installed at Medicine Bow, Wyoming, early next spring. The specifications, characteristics and features of the WTS-4 are discussed. The major components-such as rotor, nacelle and tower-are described and their status in the fabrication phase is presented.
Document ID
19830010992
Acquisition Source
Legacy CDMS
Document Type
Conference Paper
Authors
Bussolari, R. J.
(Hamilton Standard Windsor Locks, CT, United States)
Date Acquired
August 11, 2013
Publication Date
January 1, 1982
Publication Information
Publication: NASA. Lewis Research Center Large Horizontal-Axis Wind Turbines
Subject Category
Energy Production And Conversion
Accession Number
83N19263
Distribution Limits
Public
Copyright
Work of the US Gov. Public Use Permitted.
No Preview Available