NASA Logo

NTRS

NTRS - NASA Technical Reports Server

Back to Results
Develop and test fuel cell powered on-site integrated total energy systems. Phase 3: Full-scale power plant developmentSatisfactory performance is reported for the first three 12-cell sub-stacks of the 5 kW stack rebuild. Early general conclusions are presented from an economic study. Results are reported on a successful 700-hour test of a 3-cell stack in the full-sized configuration (0.33m x 0.56m). Construction of a 5 kW equivalent methanol/steam reformer based on a commercial shell-and-tube heat exchanger was completed. Several test runs are summarized. Preliminary conclusions are presented on the technical and economic aspects of fuel cell/HVAC interaction. Physical data are presented on several dense graphite materials which are candidates for gas-distribution plates. Performance of a new cathode catalyst is reported.
Document ID
19830019074
Acquisition Source
Legacy CDMS
Document Type
Contractor Report (CR)
Date Acquired
September 4, 2013
Publication Date
April 20, 1983
Subject Category
Energy Production And Conversion
Report/Patent Number
QR-6
NAS 1.26:168021
DOE/NASA/0241-6
NASA-CR-168021
Accession Number
83N27345
Funding Number(s)
CONTRACT_GRANT: DE-AI01-80ET-17088
CONTRACT_GRANT: DEN3-241
Distribution Limits
Public
Copyright
Work of the US Gov. Public Use Permitted.
No Preview Available