NASA Logo

NTRS

NTRS - NASA Technical Reports Server

Press Enter or click the Search button to begin your search.

Back to Results
Space station definition and preliminary design, WP-01. Volume 1: Executive summarySystem activities are summarized and an overview of the system level engineering tasks performed are provided. Areas discussed include requirements, system test and verification, the advanced development plan, customer accommodations, software, growth, productivity, operations, product assurance and metrication. The hardware element study results are summarized. Overviews of recommended configurations are provided for the core module, the USL, the logistics elements, the propulsion subsystems, reboost, vehicle accommodations, and the smart front end. A brief overview is provided for costing activities.
Document ID
19870008409
Acquisition Source
Legacy CDMS
Document Type
Contractor Report (CR)
Authors
Lenda, J. A.
(Martin Marietta Corp. Denver, CO, United States)
Date Acquired
September 5, 2013
Publication Date
January 16, 1987
Subject Category
Spacecraft Design, Testing And Performance
Report/Patent Number
NAS 1.26:179023
NASA-CR-179023
DR-15-VOL-1
SSP-MMC-00055-VOL-1
Report Number: NAS 1.26:179023
Report Number: NASA-CR-179023
Report Number: DR-15-VOL-1
Report Number: SSP-MMC-00055-VOL-1
Accession Number
87N17842
Funding Number(s)
CONTRACT_GRANT: NAS8-36525
Distribution Limits
Public
Copyright
Work of the US Gov. Public Use Permitted.
No Preview Available