Advanced space transportation system support contractThe general focus is on a phase 2 lunar base, or a lunar base during the period after the first return of a crew to the Moon, but before permanent occupancy. The software effort produced a series of trajectory programs covering low earth orbit (LEO) to various node locations, the node locations to the lunar surface, and then back to LEO. The surface operations study took a lunar scenario in the civil needs data base (CNDB) and attempted to estimate the amount of space-suit work or extravehicular activity (EVA) required to set up the base. The maintenance and supply options study was a first look at the problems of supplying and maintaining the base. A lunar surface launch and landing facility was conceptually designed. The lunar storm shelter study examined the problems of radiation protection. The lunar surface construction and equipment assembly study defined twenty surface construction and assembly tasks in detail.
Document ID
19890005779
Acquisition Source
Legacy CDMS
Document Type
Contractor Report (CR)
Date Acquired
September 5, 2013
Publication Date
October 30, 1988
Subject Category
Space Transportation
Report/Patent Number
NASA-CR-172104
NAS 1.26:172104
EEI-88-210
Accession Number
89N15150
Funding Number(s)
CONTRACT_GRANT: NAS9-17878
Distribution Limits
Public
Copyright
Work of the US Gov. Public Use Permitted.
No Preview Available