NASA Logo

NTRS

NTRS - NASA Technical Reports Server

Press Enter or click the Search button to begin your search.

Back to Results
Engineering Test Satellite VI (ETS-VI)The Engineering Test Satellite-VI (ETS-VI) is being developed as the third Japanese three-axis stabilized engineering test satellite to establish the 2-ton geostationary operational satellite bus system and to demonstrate the high performance satellite communication technology for future operational satellites. The satellite is expected to be stationed at 154 deg east latitude. It will be launched from the Tanegashima Space Center in Japan by a type H-II launch vehicle. The Deep Space Network (DSN) will support the prelaunch compatibility test, data interface verification testing, and launch rehersals. The DSN primary support period is from launch through the final AEF plus 1 hour. Contingency support is from final AEF plus 1 hour until launch plus 1 month. The coverage will consist of all the 26-m antennas as prime and the 34-m antennas at Madrid and Canberra as backup. Maximum support will consist of two 8-hour tracks per station for a 7-day period, plus the contingency support, if required. Information is given in tabular form for DSN support, telemetry, command, and tracking support responsibility.
Document ID
19920003877
Acquisition Source
Legacy CDMS
Document Type
Reprint (Version printed in journal)
Authors
Horii, M.
(National Space Development Agency Tokyo, Japan)
Funakawa, K.
(National Space Development Agency Tokyo, Japan)
Date Acquired
September 6, 2013
Publication Date
October 1, 1991
Publication Information
Publication: JPL, California Inst. of Tech., Deep Space Network: Mission Support Requirements
Subject Category
Astronautics (General)
Accession Number
92N13095
Distribution Limits
Public
Copyright
Work of the US Gov. Public Use Permitted.
No Preview Available