Design and Analysis of the International X-Ray Observatory Mirror ModulesThe Soft X-Ray Telescope (SXT) modules are the fundamental focusing assemblies on NASA's next major X-ray telescope mission, the International X-Ray Observatory (IXO). The preliminary design and analysis of these assemblies has been completed, addressing the major engineering challenges and leading to an understanding of the factors effecting module performance. Each of the 60 modules in the Flight Mirror Assembly (FMA) supports 200-300 densely packed 0.4 mm thick glass mirror segments in order to meet the unprecedented effective area required to achieve the scientific objectives of the mission. Detailed Finite Element Analysis (FEA), materials testing, and environmental testing have been completed to ensure the modules can be successfully launched. Resulting stress margins are positive based on detailed FEA, a large factor of safety, and a design strength determined by robust characterization of the glass properties. FEA correlates well with the results of the successful modal, vibration, and acoustic environmental tests. Deformation of the module due to on-orbit thermal conditions is also a major design driver. A preliminary thermal control system has been designed and the sensitivity of module optical performance to various thermal loads has been determined using optomechanical analysis methods developed for this unique assembly. This design and analysis furthers the goal of building a module that demonstrates the ability to meet IXO requirements, which is the current focus of the IXO FMA technology development team.
Document ID
20100024391
Acquisition Source
Goddard Space Flight Center
Document Type
Conference Paper
Authors
McClelland, Ryan S.
(SGT, Inc. Greenbelt , MD, United States)
Carnahan, Timothy M.
(NASA Goddard Space Flight Center Greenbelt, MD, United States)
Robinson, David W.
(NASA Goddard Space Flight Center Greenbelt, MD, United States)
Saha, Timo T.
(NASA Goddard Space Flight Center Greenbelt, MD, United States)
Date Acquired
August 24, 2013
Publication Date
June 28, 2009
Subject Category
Optics
Meeting Information
Meeting: 2010 SPIE Astronomical Telescopes and Instrumentation
Location: San Diego, CA
Country: United States
Start Date: June 28, 2009
End Date: July 2, 2009
Funding Number(s)
CONTRACT_GRANT: NNG07CA2 I C
Distribution Limits
Public
Copyright
Public Use Permitted.