NASA Logo

NTRS

NTRS - NASA Technical Reports Server

Back to Results
Engineering a Successful Mission: Lessons from the Lunar Reconnaissance OrbiterSchedule pressure is common in the commercial world, where late delivery of a product means delayed income and loss of profit. 12 Research spacecraft developed by NASA, on the other hand, tend to be driven by the high cost of launch vehicles and the public scrutiny of failure-- the primary driver is ensuring proper operation in space for a system that cannot be retrieved for repair. The Lunar Reconnaissance Orbiter (LRO) development faced both schedule pressure and high visibility. The team had to balance the strong push to meet a launch date against the need to ensure that this first mission for Exploration succeeded. This paper will provide an overview of the mission from concept through its first year of operation and explore some of the challenges the systems engineering team faced taking a mission from preliminary design review to pre-ship review in 3 years.
Document ID
20110007093
Acquisition Source
Goddard Space Flight Center
Document Type
Conference Paper
Authors
Everett, David F.
(NASA Goddard Space Flight Center Greenbelt, MD, United States)
Date Acquired
August 25, 2013
Publication Date
March 5, 2011
Subject Category
Space Transportation And Safety
Report/Patent Number
IEEEAC Paper 1070
Meeting Information
Meeting: IEEE Aerospace Applications Conference
Location: Big Sky, MT
Country: United States
Start Date: March 5, 2011
End Date: March 12, 2011
Sponsors: Institute of Electrical and Electronics Engineers
Distribution Limits
Public
Copyright
Work of the US Gov. Public Use Permitted.
No Preview Available