NASA Logo

NTRS

NTRS - NASA Technical Reports Server

Back to Results
Fast Conceptual Cost Estimating of Aerospace Projects Using Historical InformationAccurate estimates can be created in less than a minute by applying powerful techniques and algorithms to create an Excel-based parametric cost model. In five easy steps you will learn how to normalize your company 's historical cost data to the new project parameters. This paper provides a complete, easy-to-understand, step by step how-to guide. Such a guide does not seem to currently exist. Over 2,000 hours of research, data collection, and trial and error, and thousands of lines of Excel Visual Basic Application (VBA) code were invested in developing these methods. While VBA is not required to use this information, it increases the power and aesthetics of the model. Implementing all of the steps described, while not required, will increase the accuracy of the results.
Document ID
20130011583
Acquisition Source
Kennedy Space Center
Document Type
Conference Paper
Authors
Butts, Glenn
(NASA Kennedy Space Center Cocoa Beach, FL, United States)
Date Acquired
August 27, 2013
Publication Date
April 26, 2007
Subject Category
Statistics And Probability
Report/Patent Number
KSC-2007-057
Meeting Information
Meeting: 2007 Space Visions Congress
Location: Cocoa, FL
Country: United States
Start Date: April 26, 2007
End Date: April 28, 2007
Distribution Limits
Public
Copyright
Work of the US Gov. Public Use Permitted.
No Preview Available