NASA Logo

NTRS

NTRS - NASA Technical Reports Server

Back to Results
Sodium Variable Conductance Heat Pipe for Radioisotope Stirling SystemsIn a Stirling radioisotope system, heat must continually be removed from the General Purpose Heat Source (GPHS) modules to maintain the modules and surrounding insulation at acceptable temperatures. Normally, the Stirling convertor provides this cooling. If the converter stops in the current system, the insulation is designed to spoil, preventing damage to the GPHS, and also ending the mission. An alkali-metal Variable Conductance Heat Pipe (VCHP) has been designed to allow multiple stops and restarts of the Stirling convertor in an Advanced Stirling Radioisotope Generator (ASRG). When the Stirling convertor is turned off, the VCHP will activate when the temperatures rises 30 C above the setpoint temperature. A prototype VCHP with sodium as the working fluid was fabricated and tested in both gravity aided and against gravity conditions for a nominal heater head temperature of 790 C. The results show very good agreement with the predictions and validate the model. The gas front was located at the exit of the reservoir when heater head temperature was 790 C while cooling was ON, simulating an operating Advanced Stirling Converter (ASC). When cooling stopped, the temperature increased by 30 C, allowing the gas front to move past the radiator, which transferred the heat to the case. After resuming the cooling flow, the front returned at the initial location turning OFF the VCHP. The against gravity working conditions showed a colder reservoir and faster transients.
Document ID
20130013139
Acquisition Source
Glenn Research Center
Document Type
Conference Paper
Authors
Tarau, Calin
(Advanced Cooling Technologies, Inc. Lancaster, PA, United States)
Anderson, William G.
(Advanced Cooling Technologies, Inc. Lancaster, PA, United States)
Walker, Kara
(Advanced Cooling Technologies, Inc. Lancaster, PA, United States)
Date Acquired
August 27, 2013
Publication Date
August 2, 2009
Subject Category
Mechanical Engineering
Report/Patent Number
E-17377
Meeting Information
Meeting: 7th International Energy Conversion and Engineering Conference (IECEC 2009)
Location: Denver, CO
Country: United States
Start Date: August 2, 2009
End Date: August 5, 2009
Sponsors: American Inst. of Aeronautics and Astronautics
Funding Number(s)
CONTRACT_GRANT: NNC08CA17C
CONTRACT_GRANT: NNC07QA40P
Distribution Limits
Public
Copyright
Public Use Permitted.
No Preview Available