Manager's Role in Electromagnetic Interference (EMI) ControlThis presentation captures the essence of electromagnetic compatibility (EMC) engineering from a project manager's perspective. It explains the basics of EMC and the benefits to the project of early incorporation of EMC best practices. The EMC requirement products during a project life cycle are identified, along with the requirement verification methods that should be utilized. The goal of the presentation is to raise awareness and simplify the mystique surrounding electromagnetic compatibility for managers that have little or no electromagnetics background
Document ID
20140008325
Acquisition Source
Glenn Research Center
Document Type
Presentation
Authors
Sargent, Noel B. (AI Solutions, Inc. Lanham, MD, United States)
Lewis, Catherine C. (NASA Glenn Research Center Cleveland, OH United States)
Date Acquired
June 16, 2014
Publication Date
August 5, 2013
Subject Category
Electronics And Electrical EngineeringQuality Assurance And Reliability
Report/Patent Number
GRC-E-DAA-TN7234Report Number: GRC-E-DAA-TN7234
Meeting Information
Meeting: IEEE EMC Symposium
Location: Denver, Colorado
Country: United States
Start Date: August 5, 2013
End Date: August 9, 2013
Sponsors: Institute of Electrical and Electronics Engineers