NASA Logo

NTRS

NTRS - NASA Technical Reports Server

Press Enter or click the Search button to begin your search.

Back to Results
Surveyor Project - The Lunar programThe Surveyor flight spacecraft are designed to span the gap between the Ranger Project and the Apollo Project by making soft landings on the Moon to extend our knowledge of lunar conditions and determine the suitability of sites for proposed Apollo spacecraft landings. Hughes Aircraft Company (HAC), Space Systems Division, is under contract to fabricate the Surveyor A-21 spacecraft. The launch vehicle, a combination Atlas/Centaur, is provided by General Dynamics/Convair. Control, command, and tracking functions for the Surveyor missions are performed by the Surveyor Mission Operations System and the JPL Deep Space Network.

Surveyor I , the first flight spacecraft, was launched from Cape Kennedy, Florida, on May 30, 1966, and soft-landed on the Moon on June 2, 1966. By June 14, when lunar sunset occurred, approximately 100,000 commands had been received by the spacecraft, and 10,338 pictures of the spacecraft and its immediate vicinity had been transmitted. During the second lunar day, 812 additional pictures were transmitted by Surveyor I.

Surveyor II, the second flight spacecraft, was launched from Cape Kennedy on September 20, 1966. The space-craft performed nominally until the command was given for midcourse thrust execution. At that time, one vernier engine did not ignite. The resulting imbalance of thrust from the other two vernier engines imposed a tumbling motion on the spacecraft, from which it failed to recover. The Surveyor II mission was terminated on September 22 after all contact with the spacecraft had been lost.

The third Surveyor flight spacecraft is scheduled for launch during the second quarter of 1967.
Document ID
19670015764
Acquisition Source
Jet Propulsion Laboratory
Document Type
Contribution to a larger work
Authors
Jet Propulsion Laboratory
Date Acquired
August 3, 2013
Publication Date
January 31, 1967
Publication Information
Publication: Jet Propulsion Laboratory
Subject Category
Space Transportation and Safety
Accession Number
67N25093
Funding Number(s)
CONTRACT_GRANT: NAS7-100
Distribution Limits
Public
Copyright
Public Use Permitted.
Keywords
SURVEYOR PROJECT
LUNAR LANDING
SPACE EXPLORATION
Document Inquiry

Available Downloads

There are no available downloads for this record.
No Preview Available