NASA Logo

NTRS

NTRS - NASA Technical Reports Server

Press Enter or click the Search button to begin your search.

Back to Results
Analysis of tooling boss weld failure in the lower bulkhead of the S-1C-S fuel tankFailure analysis of tooling boss weld in lower bulkhead of Saturn 1C stage fuel tank
Document ID
19680017377
Acquisition Source
Legacy CDMS
Document Type
Contractor Report (CR)
Authors
Schoen, F. G.
(Boeing Co. Seattle, WA, United States)
Date Acquired
August 4, 2013
Publication Date
January 1, 1967
Subject Category
Machine Elements And Processes
Report/Patent Number
NASA-CR-61805
T5-6539-103
Report Number: NASA-CR-61805
Report Number: T5-6539-103
Accession Number
68N26849
Funding Number(s)
CONTRACT_GRANT: NAS8-5608
Distribution Limits
Public
Copyright
Work of the US Gov. Public Use Permitted.
No Preview Available