NASA Logo

NTRS

NTRS - NASA Technical Reports Server

Press Enter or click the Search button to begin your search.

Back to Results
Early orbit determination scheme for the Juno space vehicleThe present status (1959-60) of the ABMA early orbit determination scheme for the Juno space vehicle is described. The design of the scheme was essentially influenced by three factors: its origin centered around postflight vehicle analysis, the flexibility required for accepting varied kinds of data, and the potential of highspeed computers concentrated in ABMA's Computation Laboratory. The scheme is outlined, the tracking stations participating are shortly described, and the physical layout and computational equipment are briefly mentioned. The evaluation techniques used for the various steps of the orbit determination are discussed in detail. Appendices describe briefly the principal coordinate systems used and characteristics of the digital computer programs.
Document ID
19690071288
Acquisition Source
Jet Propulsion Laboratory
Document Type
Other
Authors
Fletcher Kurtz
(Army Missile Command Redstone Arsenal, AL, United States)
Fridtjof Speer
(Army Missile Command Redstone Arsenal, AL, United States)
Date Acquired
August 5, 2013
Publication Date
February 23, 1960
Publication Information
Publication: Seminar Proceedings on Tracking Programs and Orbit Determination
Publisher: Jet Propulsion Laboratory
Subject Category
Unknown
Meeting Information
Meeting: Seminar Proceedings on Tracking Programs and Orbit Determination
Location: Pasadena, CA
Country: US
Start Date: February 23, 1960
End Date: February 26, 1960
Sponsors: Jet Propulsion Laboratory
Accession Number
69N75467
Distribution Limits
Public
Copyright
Public Use Permitted.
Document Inquiry

Available Downloads

There are no available downloads for this record.
No Preview Available