Phase C/D program development plan. Volume 1: Program planThe Phase C/D definition of the Modular Space Station has been developed. The modular approach selected during the option period was evaluated, requirements were defined, and program definition and preliminary design were accomplished. The Space Station Project is covered in depth, the research applications module is limited to a project-level definition, and the shuttle operations are included for interface requirements identification, scheduling, and costing. Discussed in detail are: (1) baseline program and project descriptions; (2) phase project planning; (3) modular space station program schedule; (4) program management plan; (5) operations; (6) facilities; (7) logistics; and (8) manpower.
Document ID
19720008156
Acquisition Source
Legacy CDMS
Document Type
Contractor Report (CR)
Date Acquired
August 6, 2013
Publication Date
December 1, 1971
Subject Category
Space Vehicles
Report/Patent Number
MDC-G2539-VOL-1
DR-MA-05
NASA-CR-121083
Report Number: MDC-G2539-VOL-1
Report Number: DR-MA-05
Report Number: NASA-CR-121083
Accession Number
72N15806
Funding Number(s)
CONTRACT_GRANT: NAS8-25140
Distribution Limits
Public
Copyright
Work of the US Gov. Public Use Permitted.
No Preview Available