NASA Logo

NTRS

NTRS - NASA Technical Reports Server

Press Enter or click the Search button to begin your search.

Back to Results
Modular space station phase B extension preliminary system design. Volume 2: Operations and crew analysesAll analyses and tradeoffs conducted to establish the MSS operations and crew activities are discussed. The missions and subsystem integrated analyses that were completed to assure compatibility of program elements and consistency with program objectives are presented.
Document ID
19720011232
Acquisition Source
Legacy CDMS
Document Type
Contractor Report (CR)
Authors
Meston, R. D.
(North American Rockwell Corp. Downey, CA, United States)
Schall, M. R., Jr.
(North American Rockwell Corp. Downey, CA, United States)
Brockman, C. L.
(North American Rockwell Corp. Downey, CA, United States)
Bender, W. H.
(North American Rockwell Corp. Downey, CA, United States)
Date Acquired
August 6, 2013
Publication Date
January 1, 1972
Subject Category
Space Vehicles
Report/Patent Number
SD-71-217-2-VOL-2
NASA-CR-115406
Report Number: SD-71-217-2-VOL-2
Report Number: NASA-CR-115406
Accession Number
72N18882
Funding Number(s)
CONTRACT_GRANT: NAS9-9953
Distribution Limits
Public
Copyright
Work of the US Gov. Public Use Permitted.
No Preview Available